Inventory Management Techniques Case Study

  • Anupindi, R., & Bassok, Y. (1998). Approximations for multi-product contracts with stochastic demands and business volume discounts: Single supplier case. IIE Transactions, 30 (8), 723-734.CrossrefGoogle Scholar

  • Ballou, R. H. (1998). Business logistics management (4th ed.). London: Prentice-Hall.Google Scholar

  • Chand, S., & Morton, T. E. (1986). Minimal forecast horizon procedures for dynamic lot size models. Naval Research Logistics Quarterly, 33 (1), 111-122.CrossrefGoogle Scholar

  • Choi, K., Narasimhan, R., & Kim, S. (2012). Postponement strategy for international transfer of products in a global supply chain: A system dynamics examination. Journal of Operations Management, 30 (3), 167-179.Web of ScienceCrossrefGoogle Scholar

  • Christopher, M. (2016). Logistics and supply chain management (5th ed.). Harlow: Pearson Higher Education.Google Scholar

  • Coelho, L. C., & Laporte, G. (2015). An optimised target-level inventory replenishment policy for vendor-managed inventory systems. International Journal of Production Research, 53 (12), 3651-3660.Web of ScienceCrossrefGoogle Scholar

  • Copper, J. C. (1993). Logistics strategies for global businesses. International Journal of Physical Distribution and Logistics Management, 23, 12-23.Google Scholar

  • De Bolt, M. A., & Wassenhove, L. V. (1983). Lot sizes and safety stocks in MRP: A case study. Production and Inventory Management. First Quarter, 1-16.Google Scholar

  • Dudick, T. S., & Cornell, R. (1980). Inventory control for the financial executive. John Wiley & Sons Inc.Google Scholar

  • Federgruen, A., & Tzur, M. (1995). Fast solution and detection of minimal forecast horizons in dynamic programs with a single indicator of the future: Applications to dynamic lot-sizing models. Management Science, 41 (5), 874-893.CrossrefGoogle Scholar

  • Fox, M. L. (1996). Integrating vendor-managed inventory into supply chain decision-making. APICS 39th International Conference Proceeding, 126-128.Google Scholar

  • Howard, K. (1984). Inventory management in practice. International Journal of Physical Distribution and Materials Management, 14 (2), 3-36.Google Scholar

  • Jone, S. (1985). The analysis of depth interviews. In R. Walker, (Ed.), Applied Qualitative Research, Gower Pub Co.Google Scholar

  • Khan, M., Jaber, M. Y., Zanoni, S., & Zavanella, L. (2016). Vendor managed inventory with consignment stock agreement for a supply chain with defective items. Applied Mathematical Modelling, 40 (15), 7102-7114.Web of ScienceCrossrefGoogle Scholar

  • Kim, S. H. (2014). Postponement for designing mass-customized supply chains: Categorization and framework for strategic decision making. International Journal of Supply Chain Management, 3(1), 1-11.Google Scholar

  • Lundin, R. A., & Morton, T. E. (1975). Planning horizons for the dynamic lot size model: Zabel vs. protective procedures and computational result. Operations Analysis, 23 (4), 711-734.CrossrefGoogle Scholar

  • Monczka, R. M., Handfield, R. B., Giunipero, L. C., & Patterson, J. L. (2015). Purchasing and supply chain management. Cengage Learning.Google Scholar

  • Romano, P. (2014). Vendor‐managed inventory. Wiley Encyclopedia of Management.Google Scholar

  • Schwarz, L. B. (1977). A note on the near optimality of ‘5-EOQ worth’ forecast horizons. Operations Research, 25 (3), 533-536.CrossrefGoogle Scholar

  • Shaw, E. (1999). A guide to the qualitative research process. Qualitative Market Research: An International Journal. 2 (2), 59-70.Google Scholar

  • Skipworth, H., & Harrison, A. (2004). Implications of form postponement to manufacturing: A case study. International Journal of Production Research, 42 (10), 2063-2081.CrossrefGoogle Scholar

  • Southard, P. B. (2001). Extending vendor-managed inventory into alternate supply chains: A simulation analysis of costs and service levels. ETD Collection for University of Nebraska - Lincoln. AAI3016326.Google Scholar

  • Taleizadeh, A. A., Noori-daryan, M., & Cárdenas-Barrón, L. E. (2015). Joint optimization of price, replenishment frequency, replenishment cycle and production rate in vendor managed inventory system with deteriorating items. International Journal of Production Economics, 159, 285-295.Google Scholar

  • Tayur, S., Ganeshan, R., & Magazine, M. (Eds.). (2012). Quantitative models for supply chain management (17). Springer Science and Business Media.Google Scholar

  • Tsay, A., & Lovejoy, W. (1998). Quantity flexibility contracts and supply chain performance. Working Paper, Santa Clara University, Santa Clara, CA.Google Scholar

  • Urban, T. L. (2000). Supply contracts with periodic, stationary commitment. Production and Operations Management, 9 (4), 400-413.CrossrefGoogle Scholar

  • Waller, M., Johnson, M. E., & Davis, T. (1999). Vendor-managed inventory in the retail supply chain. Journal of Business Logistics, 20 (1), 183-203.Google Scholar

  • Williams, M. K. (2000). Making consignment-and vendor-managed inventory work for you. Hospital Material Management Quarterly, 21 (4), 59-63.Google Scholar

  • Wisner, J. D., Tan, K. C., & Leong, G. K. (2014). Principles of supply chain management: A balanced approach. Cengage Learning.Google Scholar

  • [1] L. Ling, Supply chain management: concepts, techniques and practices enhancing the value through collaboration. NJ: World Scientific, 2007. 372 p.Google Scholar

  • [2] M. Leseure, Key Concepts in Operations Management, 2010.Google Scholar

  • [3] D. Plinere, L. Aleksejeva, “Agent system application as a tool for inventory management improvement,” in 8th Int. Conf. on Soft Computing, Computing with Words and Perceptions in System Analysis, Decision and Control, 3–4 Sep., 2015. Antalya, Turkey, pp. 157–166.Google Scholar

  • [4] D.S. Plinere, A.N. Borisov, L. Ya. Aleksejeva, “Interaction of Software Agents in the Problem of Coordinating Orders,” Automatic Control and Computer Sciences, 2015, vol. 49, no. 5, pp. 268–276. http://dx.doi.org/10.3103/S0146411615050089Crossref

  • [5] D.C.U. Cadavid, C.C. Zuluaga, “A framework for decision support system in inventory management area,” Ninth LACCEI Latin American and Caribbean Conf., LACCEI’2011, Aug. 3–5, 2011, Medellin, Colombia.Google Scholar

  • [6] D. Dhoka, Y.L. Choudary “ABC Classification for Inventory Optimization,” IOSR Journal of Business and Management, vol. 15, Issue 1, Nov. – Dec. 2013, pp. 38–41. http://dx.doi.org/10.9790/487X-1513841Crossref

  • [7] Life cycle engineering [Online] Available: http://www.lce.com/pdf/abcclassification.pdf [Accessed: Sept. 25, 2015]

  • [8] ABC analysis (Inventory) By Joffrey Collignon, Joannes Vermorel, Feb. 2012 [Online] Available: http://www.lokad.com/abc-analysis-(inventory)-definition [Accessed: Sept. 25, 2015]

  • [9] ABC Inventory Analysis using Excel. Posted on October 1st, 2014. [Online] Available: http://chandoo.org/wp/2014/10/01/abc-inventory-analysis-using-excel [Accessed: Sept. 25, 2015]

  • [10] ABC analysis. [Online] Available: https://www.brookes.ac.uk/Documents/Students/Upgrade/ABC-analysis [Accessed: Sept. 25, 2015]

  • [11] J.J. Liu, Supply Chain Management and Transport Logistics. Routledge, 2012. 560 p.Google Scholar

  • [12] Demand Forecasting. [Online] Available: http://www.smetoolkit.org/smetoolkit/en/content/en/416/Demand-Forecasting [Accessed: Sept. 25, 2015]

  • [13] Demand Forecasting Methods. [Online] Available: http://www.forecastingmethods.net/Demand-Forecasting-Methods.html [Accessed: Sept. 25, 2015]

  • [14] R.B. Chase, F.R. Jacobs, N.J. Aquilano, Operations Management for Competitive Advantage. [Online] Available: http://highered.mheducation.com/sites/dl/free/0073525235/940447/jacobs3e_sample_ch11.pdf [Accessed: Sept. 25, 2015]

  • [15] Chapter 15: Inventory Models [Online] Available: http://web4.uwindsor.ca/users/b/baki%20fazle/70-604.nsf/b6176c6e57429a9f8525692100621c8f/0c409154799651278525694c005e3040/$FILE/Lecture4_Inv_f06_604.ppt [Accessed: Sept. 25, 2015]

  • Categories: 1

    0 Replies to “Inventory Management Techniques Case Study”

    Leave a comment

    L'indirizzo email non verrà pubblicato. I campi obbligatori sono contrassegnati *